Warrumbungle Shire Council Telemetry Upgrade

THE SITUATION WSC’s 47 telemetry sites comprised of two separate legacy telemetry systems. The north system consisted of a Radtel RTU, Analogue Radios and a Ratel SCADA Server. The south system consisted of Elpro RTUs and a single HMI in the local depot. Council seeks to modernise and amalgamate the two system with the benefits […]

Case Study: Harmonics Mitigation using Vacon Drives

A large open cut mining operation in the Hunter Valley was faced with a problem of on-site water management and re-use of such water in 3 of its Prep Plants. After careful consideration and an eye on the purse strings it was decided to construct a new water storage facility. This new dam was to hold 2 gigalitres of water which would be reticulated around the facility as per the diagram below.