Case Study: Harmonics Mitigation using Vacon Drives

A large open cut mining operation in the Hunter Valley was faced with a problem of on-site water management and re-use of such water in 3 of its Prep Plants. After careful consideration and an eye on the purse strings it was decided to construct a new water storage facility.